Inauguration of new Do Bridge over Thi Tinh River, Mega City residents benefit

In order to celebrate the event of Ben Cat to the city, on the morning of 22/04/2024, the construction of the new Do Bridge over the Thi Tinh River was officially inaugurated. The newly built Do Bridge has a total length of 165.30m; 802m long road item after adjustment; scale of 04 lanes, connecting with …

Inauguration of new Do Bridge over Thi Tinh River, Mega City residents benefit Read More »

In order to celebrate the event of Ben Cat to the city, on the morning of 22/04/2024, the construction of the new Do Bridge over the Thi Tinh River was officially inaugurated.

Lãnh đạo địa phương thực hiện nghi thức cắt băng khánh thành Cầu Đò mới
Local leaders perform ribbon-cutting ceremony to inaugurate the new Do Bridge

The newly built Do Bridge has a total length of 165.30m; 802m long road item after adjustment; scale of 04 lanes, connecting with DT748 and National Highway 13, with lighting system along 2 sides of both bridgehead and bridge roads, along with trees and drainage system… in order to ensure traffic needs for the area as well as contribute to speeding up the landscape of the area along the banks of the Thi Tinh River, facilitating the expansion of the development of the western urban area of Ben Cat City.

Cầu Đò mới chính thức thông xe
The new Do bridge is officially open to traffic

The project has been implemented since 2018, the implementation site in My Phuoc ward and An Dien commune has a total investment of VND 312 billion with provincial budget capital, town budget capital and calls for socialization, in which Thuan Loi Investment and Development Joint Stock Company (a member of Kim Oanh Group, investor of Mega City urban area project) contributed more than VND 17.3 billion.

Ông Nguyễn Thuận – Phó Chủ tịch HĐQT Kim Oanh Group (giữa) cùng các lãnh đạo Tập đoàn chụp ảnh lưu niệm tại buổi lễ
Mr. Nguyen Thuan – Vice Chairman of Kim Oanh Group (middle) and leaders of the Group took souvenir photos at the ceremony

In particular, the new Do Bridge directly connecting from Mega City urban area (scale of more than 50ha) to the center of Ben Cat becomes an extremely expensive link utility to help residents of Mega City urban area as well as people in the surrounding area easily move, quickly access a series of high-class utilities of Ben Cat City.

Trường liên kết quốc tế INschool đã được xây dựng gần hoàn thiện, sắp đi vào hoạt động
INschool has been built nearly completed, about to come into operation

Along with that, a series of high-class internal utilities such as INschool International Affiliate School are about to come into operation, Thi Tinh riverside multifunctional ecological park is being built, Mega Mall is about to be implemented will turn Mega City into a modern urban area, the most exemplary and livable in the center of Ben Cat City.

Some actual pictures in Mega City urban area:

Các dãy nhà phố tại Mega City cư dân đã được lấp đầy
Rows of townhouses in Mega City residents have been filled

Các dãy nhà phố tại Mega City cư dân đã được lấp đầy

Không gian cây xanh được cư dân chăm chút
Green space is cared for by residents
Không chỉ là nơi an cư, Mega City còn mở ra cơ hội kinh doanh thương mại cho cư dân
Not only a residence, Mega City also opens up commercial business opportunities for residents
Những dãy nhà phố khang trang tại khu đô thị
Spacious rows of townhouses in the urban area

Tags:
Scroll to Top